- We shall done fiber testing.
- We shall done clamps of DWC in box culvert, under pass & drains.
- ABD will made after all OFC work is completed.
- We shall start cable pulled in the duct after ducting work completed & shall done cable pulling work by cable pulling machine.
Man Power & machineries details-
- We shall use machineries like one HDD machine, 2-4 JCB, Cable pulling machine, Loading vehicles, Splicing machine (Ilsintech Key-man S1, Fujikura, Fitel), OTDR ( Expo, Ando, JDSU), Power meter (JDSU) etc. If more requirement of machineries as per pressure of work then will be increased.
- We shall depute of manpower like supervisor, 15-25 worker, operators for machineries, splicer for splicing & labours.
Safety tools-
- We shall used of safety tool like jacket, helmet, warning tape, cons & board of men at work & go slow.