We shall start digging work (trench) for OFC laying is depth in the median 0.8 mtr, LHS/RHS 1.8mtr & road crossing master to slave ECB connectivity by JCB, Trencher (Tractor), HDD machine & manual.

d1

Digging work by Tractor

d2

Digging work by JCB machine

c22

If there are many bridges in stretch then we will do claimps on wall of bridge.

Clamps Of Duct

And all crossings for ECB and other communication will be done with HDD, manual mauling process and JCB trenching.

de1

Road crossing by HDD machine